Skip to main content

See Blog on MVDC's ballot regarding MVDC - Stage 2 of Community Governance Review - Ashtead Parish Council

Ashtead Residents' Association

f
TAGS
H

UPDATE: Level Crossing maintenance 28th February to 2nd March.

Level Crossing to be controlled by traffic lights for duration of works

I have now had it confirmed that the crossing will remain open for the duration of the works (28th Feb to 2nd March) but there will be four-way traffic lights controlling traffic as part of the crossing will be cordoned off. They have apologised for the confusing signage at the crossing.

I have pointed out that there really should be no need for traffic lights on the service road to Woodfield Lane as all traffic should (!!!) turn left at that point. Three not four lights should speed up traffic.

There should be no need therefore for residents to use the station car park overnight so anyone doing so will receive a penalty notice.



 

This product has been added to your cart

CHECKOUT