The Residents' Association is conducting a survey on the proposed Cycle Paththrough Ashtead. Your views needed.

Ashtead Residents' Association

f
TAGS
H

Construction of seasonal ponds and scrapes on Woodfield

Work to start 30th October 2025

MVDC have advised the ARA as follows:-

We’re planning to create two shallow seasonal pond/s (1ft deep x 216m sq) that will fill with water during the winter months to increase biodiversity and take advantage of the naturally wet site. The work is due to begin on 30th October and last for approximately 2 weeks.

Why are we doing it?

Seasonal ponds are special places that help local wildlife. They fill with water and dry out at different times, which stops fish from living there and eating young newts. This makes them safe for amphibians and insects and helps lots of different plants and animals thrive.

The attached letter also makes mention of digging sumps or hollows alongside the footpath from the iron footbridge to the station to help alleviate flooding.



 

This product has been added to your cart

CHECKOUT