Tele: 0300 030 9980 (local rate call charge)
f
TAGS
H

Level Crossing Part Closure & Full Closure

Level Crossing works in July 2021

We have spoken again with Centurion Traffic who confirm works on the Level Crossing on the following dates: -

6th July to 9th July incl. 00.40 to 05.10 - Full closure overnight. Emergency Vehicle cover will continue.

17th July to 19th July incl. 22.30 to 04.30 - Three-Way Traffic Lights in operation.

With regard to the full closure periods the Residents' Association has arranged with GTR and APCOA that the ANPR system in the car park will be switched off for the duration of the closure times. Residents unable to return home during these sessions, or those wanting to leave their vehicle on the South side overnight will be able to park in the Station Car Park. Please ensure your cars are removed as soon as practicable after the crossing re-opens. Should any resident receive a Parking Charge in error please contact the ARA on ashteadra@tiscali.co.uk

Any changes will be advised here.



 

This product has been added to your cart

CHECKOUT